Customization: | Available |
---|---|
After-sales Service: | Yes |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
MVR, an acronym for mechanical vapor recompression, is a cutting-edge energy-saving innovation designed to minimize the need for external energy sources. It achieves this remarkable feat by ingeniously reutilizing the secondary steam energy that it itself produces. The fundamental principle driving this technology is the compression of secondary steam generated by the evaporator using a high-energy-efficiency steam compressor. This process elegantly transforms electrical energy into thermal energy, resulting in an increase in both pressure and temperature of the secondary steam. The cleverly elevated temperature then guides the secondary steam back to the evaporator, where it graciously heats the materials, inducing evaporation. This not only optimizes the recycling of the latent heat of vaporization of secondary steam but also exemplifies a sustainable approach to energy management.
The DM series Single-stage geared steam compressor is an engineering marvel, featuring a comprehensive array of components: the compressor body, a precise coupling, a robust gearbox, a sophisticated lubrication system, a powerful motor, an advanced electric instrument system, and a highly effective anti-surge control system. This design is characterized by its compact structure, ensuring both ease of maintenance and seamless operation.
3.3.1 Begin by placing the compressor base integrally on the foundation, ensuring that wedge-shaped shims are positioned beneath for precise leveling.
Arrange the wedge-shaped irons alternately, and once the unit is perfectly leveled, spot weld these irons at 4 to 5 strategic points.
Users are required to manufacture and install these wedges based on the specific circumstances, guaranteeing an even contact surface,
with the inclined plane able to bear a load not exceeding 40Kg/cm2).
3.3.2 Employ a level to achieve precision leveling. The unit demands exactitude with axial leveling at 0.05/1000mm and horizontal leveling at 0.10/1000mm.
3.3.3 Attaining perfect coupling alignment is crucial. Before commencing, verify these essential prerequisites:
1) Ensure the main power supply is completely turned off;
2) Detach the coupling shield carefully;
3) Remove the diaphragm coupling's intermediate section;
4) Inspect the motor's installation plane for any debris or unwanted materials ensuring a clean, smooth surface;
5) Ensure the motor bolt holes are adequately larger than the bolts to facilitate looseness and subsequent motor adjustment;
6) Have ample stainless steel gaskets ready to effectively cover the motor's foot, ensuring they are free from contaminants and sufficiently flat. Avoid inserting lengthy, slender gaskets between the motor and the base for adjustments;
7) Utilize a dial indicator or a laser alignment meter with an accuracy threshold of 0.01mm, which the customer must provide;
8) Prepare the required bracket to support the dial indicator as illustrated in the accompanying diagram;
9) Mount a dial indicator on the motor wheel hub bracket, placing the probe on the compressor wheel hub's outer edge;
10) Adjust the bolts around the motor feet meticulously to align the compressor and motor center lines nearly perfectly. The permissible maximum deviation for the outer circle is 0.05mm, with the motor shaft center line ideally positioned above the compressor's low-speed shaft center line, and a coupling end face deviation of 0.03~0.05mm;
11) Secure the motor foot bolts tightly, then reassess the coupling's outer circle and end face runouts.;
12) After successfully completing the motor idling test, reinstall the coupling's intermediate section.
3.3.4 Subsequent to reaching optimal 'levelness' and alignment of the casing, anchor bolts should be firmly tightened. When mechanical operations or trial tests are completed, bolts must be loosened and retightened for safety.
3.3.5 Given the impeller's high-speed rotation, any solid or liquid intrusion can irrevocably harm the compressor. Thus, it's crucial to ensure that the compressor's connected inlet and outlet pipelines are immaculate and adhere to the steam corrosion grade requirements. Noncompliant pipelines demand immediate rectification. It is highly advisable to incorporate solid-liquid separation equipment like a gas scrubber or sedimentation tee before the compressor inlet's straight pipe.
3.3.6 Proceed with the installation of compressor inlet and outlet pipes. Ensure that import and export pipelines are fitted with necessary accessories as depicted in the PI diagram. The compressor's supporting pipelines should rely on separate brackets, preventing undue stress on the compressor body itself.
3.3.7 Once the main fan and its additional equipment are securely installed and the concrete base has set fully, it is time to initiate the compressor's operational test. This critical step ensures that the Frequency Conversion Watervapour Compressor for Sugar Liquid Processing, brought to you by NANTONG DART-RICH FAN CO., LTD, is functioning flawlessly, paving the way for seamless sugar liquid processing.
3.3.8 For optimal performance and safety, the electric control cabinet of the compressor should be strategically placed within a close proximity of 5 meters from the compressor itself. The intricate wiring that connects the compressor to this control cabinet must be expertly threaded through piping that runs underground. After firmly positioning the electric control cabinet, it is essential to skillfully connect the wiring terminals in the cabinet with the lines interfacing with the remote DCS. This meticulous setup ensures that your Frequency Conversion Watervapour Compressor operates with precision and reliability, a hallmark of NANTONG DART-RICH FAN CO., LTD's commitment to excellence.
Founded in 1966, Nantong Dart-Rich Fan Co., LTD. (initially known as State-Owned Nantong Fan Factory) has a rich heritage that has evolved over the decades. In a strategic move to invigorate our corporate structure, we underwent an equity structure reform in June 2019. This transformation marked our evolution into a dynamic partnership enterprise. To support our rapid growth and expansion, we launched Dart-Rich (Hunan) Fan Co., Ltd. in December 2020. Our company embraced state-of-the-art German technology in 2004, leading to groundbreaking advancements in product stability, reliability, high efficiency, low noise, wear resistance, and temperature endurance. We are proud to be the primary drafter of the industry standard for integral geared assembly type centrifugal steam compressors.
Dart-Rich is accredited with ISO9001, ISO14001, and ISO45001 system certifications. Our diverse product range includes steam compressors, fans, and blowers, extensively utilized across sectors like metallurgy, chemical industry, electric power, environmental protection, construction materials, light industry, and emerging energy fields. Additionally, we offer system optimization solutions and maintenance services tailored for energy-saving renovations of wind systems.
At Dart-Rich, we champion continuous innovation in management, mechanisms, corporate culture, and technology. We are steadfast in building a digital intelligence framework, fostering a robust striver culture, and implementing 'three wisdom' strategies. Our market insights drive organizational growth, enhance customer service capabilities, and facilitate rapid, sustainable development.
Upholding core values of 'Honest and Trustworthy; Dedicated and Professional; Altruism and Mutualism,' Dart-Rich is committed to enhancing enterprise value, maximizing customer benefits, and fostering a culture of shared responsibility and mutual creation among all stakeholders. Our aim is to lead the charge as the foremost provider of reliable and eco-friendly fluid machinery solutions!
1. Experience unprecedented efficiency with our high-performance 3D flow semi-open impeller! Featuring a professional aerodynamic and structural design, the impeller boasts an advanced profile, ensuring the blower operates stably across a broad range of conditions. Revel in the remarkable polytropic efficiency of the main machine, reaching an impressive 88%!
2. Enjoy the extended versatility and operational range offered by our innovative vaneless diffuser. Its design allows for a wide array of applications and seamless adaptability.
3. Benefit from our compact and cohesive design where the gearbox and compressor are seamlessly integrated. This streamlined structure not only saves space but also enhances performance.
4. Simplify your processes with our fully integrated, skid-mounted package. This comprehensive system, including a compressor, gearbox, and motor, is designed for optimal ease in transportation and installation.
5. Discover the epitome of convenience and performance with our highly automated system. It promises unrivaled reliability, exceptional efficiency, impressive energy savings, and intuitive operation, making it the ideal choice for modern processing needs.
1, At NANTONG DART-RICH FAN CO., LTD, we champion "intelligent service" aimed at providing "more accurate, more comprehensive" solutions. Our robust presence is marked by 13 marketing service centers across China and a global sales and service network.
2, Our dedicated after-sales service professionals are passport-ready, ensuring rapid response to international maintenance needs. We are committed to providing seamless 24-hour service support throughout your project's lifecycle.
3, "1191" Service Commitment: Immediate feedback for on-site issues within 1 minute; service demand acknowledgment within 1 hour; solution proposal within 9 hours; and personnel deployed to site within 1 day, ensuring swift and efficient resolutions.
4, For any assistance, reach us at our after-sales service hotline: 0086-400-625-2668.
Q1. Are you a factory?
A1. Yes, Dart-Rich has production base in Nantong City Jiangsu Province and Yueyang City, Hunan Province China.
Q2. Where is your factory?
A2. Our Production base in Nantong City Jiangsu Province, and we have other factory in Hunan.
Q3. How long is your warranty?
A3. We insist on providing customers with the best protection, the whole machine, 24 months warranty, 36 months warranty for the host.
Q4. What certification do you have?
A4. At present, we have passed ISO 9001, ISO 14001, ISO 45001 and so on.
Q5. What accessories do you use for your machine?
A5. Our spare parts and hosts only cooperate with big brands, we insist on winning customers with quality.
Q6. How many years of history does your factory have?
A6. Our factory started in 1966, we insist on continuous innovation and research and development. In June 2019, the equity structure reform was carried out and the company became a partnership enterprise; to meet the needs of the company's rapid development, Dart-Rich (Hunan) Fan Co., Ltd. was established in December 2020.
Q7. Do you have an official website?
A7. If you have any questions, please feel free to contact us.
The complete set of pneumatic technology for this product is imported from a highly advanced international stage model and state-of-the-art design software. This ensures that we can offer our clients a swift and optimal model selection process. Our products are meticulously classified into 18 distinct series, catering to an impressive flow rate range of 1-240 t/h with a temperature elevation spanning 8-24ºC.
This product boasts an entire suite of pneumatic technology sourced from cutting-edge international stage models and premier design software. This empowers users with the quickest and most efficient selection process. Our offerings are elegantly categorized into 5 series, accommodating a versatile flow range of 4-250 t/h, with a temperature increment of 4-11.2ºC.
1. Heat pump distillation - Harness the power of our cutting-edge technology to revolutionize heat pump distillation processes.
2. Waste Heat Recovery - Elevate your efficiency with unparalleled waste heat recovery solutions.
3. Environmental Protection Field - Transform industrial challenges into triumphs with our comprehensive solutions for wastewater treatment, including lithium battery wastewater and recycling, landfill leachate treatment, and sodium-potassium separation in waste incineration fly ash.
4. Lithium-Ion Battery Industry - Pioneering advancements in the lithium-ion battery sector, we offer sophisticated solutions for salt lake lithium extraction, iron phosphate devices, ternary precursor wastewater treatment, and recycling of lithium and nickel battery wastewater.
5. New Energy Industry - Propel your new energy initiatives forward with our specialized treatments for photovoltaic and polycrystalline silicon wastewater.
6. Food & Beverage Industry - Enhance your production processes with our innovative methods for the concentration and extraction of amino acids like alanine, sugar liquid drying, and beverage jam concentration.
7. Pharmaceutical Industry - Optimize pharmaceutical production through our superior techniques for evaporation, concentration, crystallization, and drying in both Chinese and Western medicine manufacturing.
8. Chemical Industry - Empower your chemical production line with our diverse range of solutions, from caprolactam process polymerization to organic matter crystallization and fragrance purification.
9. Metallurgical Industry - Achieve excellence in metallurgical processes with our advanced treatment solutions for sintering desulfurization, coking, and vanadium extraction wastewater.
10. Power Industry - Spearhead your power generation operations with our state-of-the-art desulfurized wastewater treatment technologies for power stations, ensuring sustainable and efficient practices.